Client / WorleyParsons

FortisBC is replacing their existing NPS 24 intermediate pressure gas line between Coquitlam and Vancouver in the Lower Mainland. The new NPS 30 line is 20km long will have additional capacity and will address system reliability and improve reliability. RAM was retained by Worley Parsons to assist with construction planning and permitting. Our scope of work includes design review, integration management, stakeholder management and constructability input related to installing a pipeline through a major urban centre. We are also liaising with the owners of existing infrastructure in the pipeline right of way including the various municipalities, Fortis, Telus, Shaw and the Ministry of Transportation and Infrastructure